Create Labor Time Activities
Form ID: (AM513000)
This process will create employee time activities on the Employee Time Activities (EP307000) form from direct or indirect production labor transactions. If the production order references a project the project and task are passed to the time activities. This process is available only if the Time Management feature is enabled on the Enable/Disable Features (CS100000) form.
Form Toolbar
The form toolbar includes standard and form-specific buttons and commands. For the list of standard buttons, see Form Toolbar and More Menu. The form-specific commands are listed in the following table.
Button | Description |
---|---|
Process | Creates time activities for the selected labor transactions in the list. |
Process All | Creates time activities for all labor transactions in the list. |
Skip Selected | Creates time activities for all labor transactions in the list except those selected. |
Summary Area
Element | Description |
---|---|
Show All Items | If cleared, labor transactions with a status of Unprocessed are included. |
Labor Transaction Table
The table lists all labor batches and their transaction lines. The default is to only list the labor transactions with a time card status of Unprocessed.
The table toolbar includes only standard buttons. For the list of standard buttons, see Table Toolbar.
Column | Description |
---|---|
Selected | If checked, the labor transaction line is selected. |
Batch Nbr | The Labor batch in which this transaction line resides. |
TranDate | Transaction Date from the Labor batch. |
Order Type | The production order type for direct labor transactions. |
Production Nbr | The production order number for direct labor transactions. |
Employee ID | The production employee from the transaction line. |
Labor Time | The labor time from the transaction line. |
Labor Rate | The labor rate is either from the work center standard cost or from the employee cost rate dependent on the Use Labor Rate setting on the Production Preferences (AM102000) form. |
Labor Amount | The labor time multiplied by the labor rate. |
Project | The project from the production order or the non-project code. |
Project Task | The task from the project. |
Time Card Status | The status is for the labor transaction and can be one of the following:
|
Warehouse | The warehouse from the direct labor transaction. |
Inventory ID | The inventory item from the production order for direct labor transactions. |
Labor Code | The labor codes from the labor transaction. |