Create Labor Time Activities
Form ID: (AM513000)
On this form, you can run a process that creates employee time activities on the Employee Time Activities (EP307000) form from direct or indirect production labor transactions. If the production order references a project, the project and task are passed to the time activities.
Attention: In activities created by using this form, labor time is rounded to
minutes, even if the original time was reported in seconds.
This process is available only if the Time Management feature is enabled on the Enable/Disable Features (CS100000) form.
Form Toolbar
The form toolbar includes the buttons described below.
| Button | Description |
|---|---|
| Process | Creates time activities for the selected labor transactions in the list. |
| Process All | Creates time activities for all labor transactions in the list. |
| Skip Selected | Creates time activities for all labor transactions in the list except those selected. |
Summary Area
| Element | Description |
|---|---|
| Show All Items | A check box that you select to review all labor transactions in the table. If this check box is cleared, labor transactions with a status of Unprocessed are included. |
Table
The table lists all labor batches and their transaction lines. The default is to only list the labor transactions with a time card status of Unprocessed.
The table toolbar has only standard buttons.
| Column | Description |
|---|---|
| Included | A check box that you select to include the labor transaction line in processing when you click Process or exclude it from processing when you click Skip Selected. |
| Batch Nbr. | The labor batch in which this transaction line resides. |
| Tran. Date | The transaction date of the labor batch. |
| Order Type | The production order type for direct labor transactions. |
| Production Nbr. | The production order number for direct labor transactions. |
| Operation ID | The operation ID for direct labor transactions. |
| Employee ID | The production employee from the transaction line. |
| Labor Time | The labor time from the transaction line. |
| Labor Rate | The labor rate is either from the work center standard cost or from the employee cost rate dependent on the Use Labor Rate setting on the Production Preferences (AM102000) form. |
| Labor Amount | The labor time multiplied by the labor rate. |
| Project | The project from the production order or the non-project code. |
| Project Task | The task from the project. |
| Time Card Status | The
status
of
the labor
transaction,
which
can
be one of the following:
|
| Warehouse | The warehouse from the direct labor transaction. |
| Inventory ID | The inventory item from the production order for direct labor transactions. |
| Labor Code | The labor codes from the labor transaction. |
