Project AP Details
Form ID: (PM651001)
On this generic inquiry form, you can view the AP amounts—such as unbilled amounts, paid amounts, and unreleased retainage—for each listed document line. The system calculates these values as of the date you specify; you can also select a project and vendor to view only their document lines.
You can use the form to verify the AP amounts the system has calculated on the Project Cash Flow (PM651010) form.
Form Toolbar
The form toolbar has only standard buttons.
Selection Area
In this area, you select the date through which the system shows document lines in the table. By specifying a particular project or vendor (or both), you can narrow the range of document lines listed in the table.
| Element | Description |
|---|---|
| Date | The date through which data is displayed—that is, you’ll see document lines up to and including this date. By default, the system inserts the current business date. |
| Project | The project for which you want to view the AP amounts. |
| Vendor | The vendor for which you want to view the AP amounts. If you select a vendor, you’ll see data for the vendor whose items or services were purchased for the project. |
Table
In the table, you can view the AP data for the selection criteria you’ve specified. You can use this information to verify the AP amounts that the system has calculated on the Project Cash Flow (PM651010) form. Each row represents a document line.
Below you’ll find descriptions of the columns that show information about the listed documents, their currency rates, and their calculated values, along with calculation formulas the system uses.
- The leftmost columns of the table aren't described in this topic. These columns display the document's basic information—such as company, branch, project, project task, account group, and cost code. If you need information about these UI elements, see their descriptions on the document's data entry form.
- The values are calculated in the project currency. The form shows values in the base, project, and document currencies if the Multicurrency Accounting and Multicurrency Projects features are enabled on the Enable/Disable Features (CS100000) form.
The table toolbar has only standard buttons.
| Column | Description |
|---|---|
| Date | The document date, which can be one of the following:
|
| Inventory ID | The stock or non-stock item specified in the document line. |
| Record Type | The type of the record, which is created on the Bills and Adjustments (AP301000) or Checks and Payments (AP302000) form. |
| Document Type | The specific type of the document created on the Bills and Adjustments (AP301000) or Checks and Payments (AP302000) form. |
| Ref. Nbr. | The reference number of the document. |
| Line Nbr. | The line number of the document. |
| AP Document Type | The type of the AP document, such as Bill, Credit Adj., Debit Adj., or Prepayment. |
| AP Document Ref. Nbr. | The reference number of the AP document—such as bill, credit adjustment, debit adjustment, or prepayment—in the system. |
| AP Document Line Nbr. | The line number of the AP document. |
| Commitment Doc. Type | The type of the subcontract or purchase order related to the project associated with this document line, which is Normal, Project Drop-Ship, or Subcontract. |
| Commitment Ref. Nbr. | The reference number of the subcontract or purchase order. |
| Commitment Line Nbr. | The line number of the subcontract or purchase order. |
| Base Currency | The base currency used for accounting in the branch associated with the project specified in this document line. |
| Document Currency | The currency of the document. |
| Vendor | The vendor specified in the subcontract, change order, purchase order, bill, or payment. |
| Retainage Document | A check box that indicates (if selected) that the AP document with a withheld retainage amount from the original document has been released. The system copies the state of the check box from the document on the Bills and Adjustments (AP301000) form. |
| Rate (Project Curr.) | The rate used to convert document amounts to the project currency. The system uses the applicable rate on one of these dates:
|
| Rate (Base Curr.) | The rate used to convert document amounts to the base currency of the
project. The system uses the applicable rate on one of these dates:
|
| UOM | The unit of measure specified in the line of the purchase order, subcontract, or bill specified in this document line. |
| Committed Qty. | The committed quantity, which is either of the following:
|
| Committed Unit Cost (Project Curr.) | The committed unit cost, which the system calculates by using this formula:
Committed Amount (Project Curr.) / Committed Qty.Tip: This value is calculated in the project currency. If multicurrency projects are
set up in your system, you'll also see the Committed Unit Cost (Base
Curr.) column showing the value in the base currency. The system
calculates it similarly. |
| Committed Amount (Project Curr.) | The extended cost specified in the line of any of the following documents:
Tip: This value is calculated in the project currency. If
multicurrency projects are set up in your system, you'll also see the
Committed Amount (Base Curr.) column showing the value in
the base currency. The system calculates it similarly. |
| Committed Retainage (Project Curr.) | The committed retainage amount, which the system calculates by using this
formula: Retainage Amount * Rate (Project
Curr.).
Tip: This
value is calculated in the project currency. If multicurrency projects are set up
in your system, you'll also see the Committed Retainage (Base
Curr.) column showing the value in the base currency. The system
calculates it similarly. |
| Billed Qty. | The quantity of the items that have been billed on the Bills and Adjustments (AP301000) form, which is one of the following:
|
| Unit Cost (Project Curr.) | The cost per UOM of the inventory item specified in the line, which the system
calculates by using this formula: Extended Cost (Project Curr.) / Billed
Qty.Tip: This value is calculated in the project currency. If
multicurrency projects are set up in your system, you'll also see the
Unit Cost (Base Curr.) column showing the value in the
base currency. The system calculates it similarly. |
| Extended Cost | The extended cost specified in the line of the released document of the Bill or Credit Adj. type on the Bills and Adjustments (AP301000) form. For a document of the Debit Adj. type, the cost is shown as a negative value. |
| Extended Cost (Project Curr.) | The extended cost in the project currency, which the system calculates by using
this formula: Extended Cost * Rate (Project Curr.).If the project currency is the same as the document’s base currency, the system shows the extended cost in the base currency. Tip: This value is calculated in the project currency. If
multicurrency projects are set up in your system, you'll also see the
Extended Cost (Base Curr.) column showing the value in
the
base currency. The system calculates it
similarly. |
| Billed Inclusive Tax (Project Curr.) | The billed inclusive tax amount applied to the project's original AP bills,
which the system proportionally spreads across the lines of the bill. Tip: This value is calculated in the project currency. If multicurrency
projects are set up in your system, you'll also see the Billed
Inclusive Tax (Base Curr.) column showing the value in the base
currency. The system calculates it similarly. |
| Billed Tax (Project Curr.) | The billed exclusive tax amount applied to the project's original AP bill,
which the system proportionally spreads across the lines of the bill with the tax
category that requires this tax calculation. For a document of the Debit Adj. type, the amount is shown as a negative value. Tip: This
value is calculated in the project currency. If multicurrency projects are set up
in your system, you'll also see the Billed Tax (Base Curr.)
column showing the value in the base currency. The system calculates it
similarly. |
| AP Retained Amount (Project Curr.) | The AP retainage amount, which the system calculates by using one of these
formulas depending on the type of the document:
Tip: This value is calculated in the project currency. If
multicurrency projects are set up in your system, you'll also see the
AP Retained Amount (Base Curr.) column showing the value
in the base currency. The system calculates it similarly. |
| AP Retained Taxes (Project Curr.) | The retained tax amount applied to the project's original AP bills and
retainage debit adjustments, which the system proportionally spreads across the
lines of the bill. This amount doesn't include the use tax, whose amount you can review in the Use Tax (Project Curr.) column. For a document of the Debit Adj. type or retainage bill, the amount is shown as a negative value. Tip: This value is calculated in the project
currency. If multicurrency projects are set up in your system, you'll also see the
AP Retained Taxes (Base Curr.) column showing the value
in the base currency. The system calculates it similarly. |
| AP Amount | The sum of the amounts specified in the lines of the released bill or credit adjustment and the billed tax amount, which the system calculates in the document currency. |
| AP Amount (Project Curr.) | The amount of the bill, which the system calculates by using this formula:
AP Amount / Rate (Project Curr.).If the project currency is the same as the document currency, this value is the same as the AP Amount. If the project currency is the same as the document base currency, the system multiplies the AP Amount by the base currency rate specified on the document's data entry form. Tip: This value is calculated in the project currency. If multicurrency
projects are set up in your system, you'll also see the AP Amount (Base
Curr.) column showing the value in the base currency. The system
calculates it similarly. |
| AP Paid Amount | The paid amount of the bill, which can be either of the following depending on
the state of the Pay by Line check box on the Bills and Adjustments (AP301000) form:
|
| AP Paid Amount (Project Curr.) | The paid amount of the bill, which the system calculates by using this formula:
AP Paid Amount * Rate (Project Curr.).Tip: This value
is calculated in the project currency. If multicurrency projects are set up in
your system, you'll also see the AP Paid Amount (Base
Curr.) column showing the value in the base currency. The system
calculates it similarly. |
| AP Cash Discount (Project Curr.) | The cash discount, which can be either of the following depending on the state
of the Pay by Line check box on the Invoices and Memos (AR301000) form:
Tip: This value is calculated in the project currency. If
multicurrency projects are set up in your system, you'll also see the
AP Cash Discount (Base Curr.) column showing the value in
the base currency. The system calculates it similarly. |
| Withheld Tax Amount (Project Curr.) | The withheld tax amount, which can be either of the following depending on the
state of the Pay by Line check box on the Invoices and Memos (AR301000) form:
Tip: This value is calculated in the project currency. If
multicurrency projects are set up in your system, you'll also see the
Withheld Tax Amount (Base Curr.) column showing the value
in the base currency. The system calculates it similarly. |
| Paid Inclusive Tax (Project Curr.) | The paid inclusive tax amount, which the system calculates by using this
formula: (Amount Paid + Cash Discount Taken) * Billed Inclusive Tax (Project
Curr.) of each paid bill line / Amount of the paid
bill.
Tip: This value is calculated in the project
currency. If multicurrency projects are set up in your system, you'll also see the
Paid Inclusive Tax (Base Curr.) column showing the value
in the base currency. The system calculates it similarly. |
| Exclusive Taxes on Paid AP (Project Curr.) | The tax amount on the paid amount of the bill, which the system calculates by
using this formula: (Amount Paid + Cash Discount Taken) * Billed Tax
(Project Curr.) of each paid bill line / Amount of the paid
bill.
Tip: This value is calculated in the project
currency. If multicurrency projects are set up in your system, you'll also see the
Exclusive Taxes on Paid AP (Base Curr.) column showing
the value in the base currency. The system calculates it similarly. |
| Use Tax (Project Curr.) | The billed use tax amount applied to the project's original AP bills, which the
system proportionally spreads across the lines of the bill. Tip: This
value is calculated in the project currency. If multicurrency projects are set up
in your system, you'll also see the Use Tax (Base Curr.)
column showing the value in the base currency. The system calculates it
similarly. |
| Realized Gain/Loss (Project Curr.) | The realized gain or loss, which the system calculates by using this formula:
AP Paid Amount * Rate (Project Curr.) on the original bill's date - Rate
(Project Curr.) on the payment date.If the project currency is the same as the bill's currency, the realized gain or loss is 0. If the project currency is the same as the bill's base currency, the realized gain or loss is the same as the one specified in the GL transaction. Tip: This value is calculated in the project currency. If multicurrency projects are
set up in your system, you'll also see the Realized Gain/Loss (Base
Curr.) column showing the value in the base currency. The system
calculates it similarly. |