Potential Project Budget Overruns
Form ID: (PM404000)
On this form, you can view the list of potential budget overruns of a particular project. You can filter the list of budget overruns by using selection criteria. For instance, you can display only budget overruns associated with a specific document type, account group, project task, cost code, inventory item, or date—or any combination of these criteria. For more information, see Project Budget: Budget Control on Document Entry.
Form Toolbar
The form toolbar includes standard and form-specific buttons and commands. For the list of standard buttons, see Form Toolbar and More Menu. The form-specific commands are listed in the following table.
Command | Description |
---|---|
Calculate | Calculates potential budget overruns for the selected project and displays the overruns in the table. |
Selection Area
You use the elements in this area to select budget overruns for display in the table.
Element | Description |
---|---|
Document Type | The document types for which the potential budget overruns should be calculated and
shown. By default, all the document types are selected. You can
select one or multiple document types, which can be one of the
following:
|
Project | The identifier of the project whose potential budget overruns you want to view. |
Start Date | The starting date of the range for which you want to view budget overruns. If you want to see budget overruns for all dates, leave this box (and End Date) blank. |
End Date | The ending date of the range for which you want to view budget overruns. If you want to see budget overruns for all dates, leave this box (and Start Date) blank. |
Project Task | The project task for which you want to view budget overruns. If you want to see budget overruns associated with all tasks, leave this box blank. |
Account Group | The account group for which you want to view budget overruns. If you want to see budget overruns associated with all account groups, leave this box blank. |
Cost Code |
The cost code for which you want to view budget overruns. If you want to see budget overruns associated with all cost codes, leave this box blank. The box is available if the Cost Code feature is enabled on the Enable/Disable Features (CS100000) form. |
Inventory ID | The inventory item for which you want to view budget overruns. If you want to see budget overruns associated with all items, leave this box blank. |
Table
Column | Description |
---|---|
Type | The type of the document that resulted in the potential budget overrun. |
Reference Nbr. | The number of the document that resulted in the potential budget overrun. |
Project | The project for which the potential budget overrun was detected. |
Project Description | The brief description of the project for which the potential budget overrun was detected. |
Project Task | The project task associated with the line that resulted in the potential budget overrun. |
Account Group | The account group associated with the line that resulted in the potential budget overrun. |
Cost Code |
The identifier of the cost code associated with the line that resulted in the potential budget overrun. The column is available if the Cost Code feature is enabled on the Enable/Disable Features (CS100000) form. |
Inventory ID | The identifier of the stock or non-stock item associated with the line that resulted in the potential budget overrun. |
Transaction Description | The description of the document line that resulted in the potential budget overrun. |
Budgeted | The revised budgeted amount of the corresponding project budget line in the project currency. |
Consumed |
The sum of the actual amount and the committed open amount of the corresponding project budget line in the project currency. If the corresponding purchase order line has a related AP bill, the consumed amount is equal to the actual amount. |
Available | The difference between the Budgeted and Consumed amounts in the project currency. |
Document | The sum of the Ext. Cost minus the Discount Amount amounts of all the document lines that impact the same budget line in the document in the project currency. |
Remaining | The difference between the Available and Document amounts in the project currency. |
Project Currency |
The project currency. This column is available if the Multicurrency Projects feature is enabled on the Enable/Disable Features (CS100000) form. |