Engineering Workbench
Form ID: (AM208100)
You use this form to view, create, and modify bills of material (BOMs), including multilevel BOMs, displayed in a tree structure.
On this form, you can do any of the following:
- Change the order of operationsAttention:When you reorder operations, the system automatically updates the operation IDs based on the new order.
- Change the order of materials within an operation
- Move materials between operations
- Add new operations or materials
- Delete operations or materials
- Click a tree node to view its settings and modify these settings if needed
To move a node within the tree, you drag the node to the needed position. Some movements are forbidden, such as the movement of an operation at a lower level than another operation or the movement of a material under another material. If you attempt a forbidden movement, the system displays an error message and does not move the node.
Form Toolbar
The form toolbar includes standard buttons and form-specific buttons and commands. For the list of standard buttons, see Form Toolbar and More Menu. The form-specific commands can be shown as buttons on the form toolbar, as commands on the More menu, or in both places. These commands are listed in the following table in alphabetical order.
Command | Description |
---|---|
Archive BOM | Changes the status of the bill of material revision to Archived. A bill of material revision with this status cannot be used for production, for planning, or as a source for estimates and configurations. |
BOM Attributes | Opens the BOM Attributes (AM204500) form so that the attributes of the selected BOM can be viewed or edited. |
BOM Summary | Opens the BOM Summary (AM611000) report for the BOM, where you can view all materials of the BOM and their unit costs. |
Calculate BOM Cost |
Opens the BOM Cost Settings dialog box, where you can specify the settings for calculating the BOM cost for a specific lot size. If you click OK in the dialog box, the system calculates
the costs and displays them in the BOM Cost Summary dialog box, which it opens.
|
Compare BOM | Opens the BOM Compare (AM410000) form, and populates the left pane of the form with the tree view of the current bill of material and revision. |
Copy BOM | Opens the Copy BOM dialog box, in which you can specify the settings for copying the current bill of material to a new bill of material. |
Create ECR | Opens the Engineering Change Request (AM210000) form populated with the applicable settings of the current BOM. |
Multilevel | Opens the Multi Level BOM (AM413000) report for the BOM. |
Set as Default BOM | Opens the Default BOM Levels dialog box. In the dialog box, you can select the combination of entities (any of the following: item, item–warehouse pair, and subitem) for which the selected bill of material is set as the default. |
Set as Planning BOM | Opens the Planning BOM Levels dialog box. In the dialog box, you can select the combination of entities (any of the following: item, item–warehouse pair, and subitem) for which the selected bill of material is set as the planning BOM. |
Element | Description |
---|---|
The Copy From section has the following elements. | |
From BOM ID | The identifier of the selected BOM whose settings will be copied. |
From Revision | The BOM revision. |
From Inventory ID | The inventory ID of the BOM. |
From Warehouse ID | The warehouse ID of the BOM. |
The Copy To section has the following elements. | |
To BOM ID |
The identifier of the bill of material that will be created. This box is available only if the Manual Numbering check box is selected on the Numbering Sequences (CS201000) form for the numbering sequence that is used for bills of material, as specified on the BOM Preferences (AM101000) form. If the check box is cleared, the system will assign the identifier automatically. |
To Revision | The revision of the BOM to be created. |
To Inventory ID | The identifier of the inventory item for which the BOM will be created. |
To Warehouse ID | The identifier of the default warehouse for storing the item to be produced. |
Update material warehouse | A check box that indicates (if selected) that the system will copy the warehouse ID specified in the To Warehouse ID box to all material lines of the new BOM only if another warehouse is specified in the material lines; also, the system will clear the warehouse location in the material lines. For material lines with the Warehouse column left empty, the system will not copy the warehouse. |
The Copy Notes section has the following elements. | |
BOM Header | A check box that indicates (if selected) that the system will copy notes specified at the BOM level to the new BOM. |
Operation | A check box that indicates (if selected) that the system will copy notes specified at the operation level to the new BOM. |
Material | A check box that indicates (if selected) that the system will copy notes specified at the material level to the new BOM. |
Step | A check box that indicates (if selected) that the system will copy notes specified at the step level to the new BOM. |
Tool | A check box that indicates (if selected) that the system will copy notes specified at the tool level to the new BOM. |
Overhead | A check box that indicates (if selected) that the system will copy notes specified at the overhead level to the new BOM. |
The dialog box has the following buttons. | |
Copy | Creates the copy of the bill of material with the specified settings, closes the dialog box, and opens the new bill of material on the form. |
Cancel | Closes the dialog box without creating a copy of the bill of material. |
Element | Description |
---|---|
The dialog box has the following boxes. |
|
Lot Size | The lot size for which you would like to view costs. |
Level |
The BOM level for which you would like to view BOM costs. You can select one of the following options:
|
The dialog box has the following buttons. | |
OK | Closes the dialog box and opens the BOM Cost Summary dialog box with the calculated costs based on the settings you have selected. |
Cancel | Closes the dialog box without displaying BOM costs. |
Element | Description |
---|---|
Before the sections of the dialog box, the following element is shown. |
|
Lot Size | Read-only. The lot size that you entered in the BOM Cost Settings dialog box. Fixed costs are divided by this lot size to calculate the unit cost. |
The Labor section contains the following elements. |
|
Fixed Labor | The fixed labor cost, which the system calculates by using the
following formula: (Total number of setup hours) * (Work center
rate for each operation) . |
Variable Labor | The variable labor cost, which the system calculates by using the
following formula: (Total number of runtime hours per unit) *
(Work center rate) * (Lot size) .Attention: If a
rate type of an operation run time is pieces per hour, the system
converts the rate to hours per piece first. |
The Overhead section contains the following elements. |
|
Fixed Overhead | The total of the overhead costs with a type of Fixed. |
Variable Overhead | The total of the overhead costs with a type of Variable. |
The Other Costs section contains the following elements. | |
Machine | The machine cost, which the system calculates by using the following
formula: (Total number of machine hours) * (Machine rate per
operation) * (Lot size) . |
Tools | The total tool costs for all operations. The system calculates the tool costs for the lot size you have specified. |
Materials | The material cost, which the system calculates by using the following
formula: (Quantity required for each component) * (Current unit
cost of the item–warehouse pair) * (Lot
size) . |
The Totals section contains the following elements. | |
Unit Cost | The unit cost, which the system calculates by using the following
formula: (The total of all costs) / (Lot size) . |
Total Cost | The sum of all costs. |
The dialog box has the following button. | |
OK | Closes the dialog box. |
Element | Description |
---|---|
The dialog box has the following elements. |
|
Item | A check box that you select to specify the bill of material in the Default BOM ID box on the Manufacturing tab of the Stock Items (IN202500) form for the item specified in the Inventory ID box of the Summary area. |
Subitem |
A check box that you select to specify the bill of material in the Default BOM ID column of the Sub Item Defaults table on the Manufacturing tab of the Stock Items form and, if the record for the combination of the item and warehouse exists, on the Item Warehouse Details (IN204500) form for the subitem specified in the Subitem box of the Summary area. This check box is displayed only if the Inventory Subitems feature is enabled on the Enable/Disable Features (CS100000) form. Important:
The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Warehouse | A check box that you select to specify the bill of material in the Default BOM ID box on the Manufacturing tab of the Item Warehouse Details form for the item and warehouse specified in the Inventory ID and Warehouse boxes of the Summary area accordingly. |
The dialog box has the following button. | |
Update | Specifies the bill of material as the default bill of material for the selected entities and closes the dialog box. |
Cancel | Closes the dialog box without specifying the bill of material as the default bill of material for any entities. |
Element | Description |
---|---|
The dialog box contains the following elements. |
|
Item | A check box that you select to specify the bill of material in the Planning BOM ID box on the Manufacturing tab of the Stock Items form for the item specified in the Inventory ID box of the Summary area. |
Subitem |
A check box that you select to specify the bill of material in the Planning BOM ID column of the Sub Item Defaults table on the Manufacturing tab of the Stock Items form and, if the record for the combination of the item and warehouse exists, on the Item Warehouse Details form for the subitem specified in the Subitem box of the Summary area. This check box is displayed only if the Inventory Subitems feature is enabled on the Enable/Disable Features (CS100000) form. Important:
The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Warehouse | A check box that you select to specify the bill of material in the Planning BOM ID box on the Manufacturing tab of the Item Warehouse Details form for the item and warehouse specified in the Inventory ID and Warehouse boxes of the Summary area accordingly. |
The dialog box has the following button. | |
Update | Specifies the bill of material as the planning bill of material for the selected entities and closes the dialog box. |
Cancel | Closes the dialog box without specifying the bill of material as the planning bill of material for any entities. |
Summary Area
In this area, you can view general information about the bill of material, such as the identifier, the status, and the effective date. You can change information in this area if the bills of material is assigned the On Hold status—that is, when the Hold check box is selected.
Element | Description |
---|---|
BOM ID | The identifier of the bill of material. |
Revision | The identifier of the BOM revision, which is the modification of the bill of material. |
Hold |
A check box that you select to change the bill of material's status to On Hold so that you can make changes to it. If the Hold BOM Revisions on Entry check box is selected on the BOM Preferences (AM101000) form, for a new bill of material, this check box is selected by default. Otherwise, this check box is cleared and the bill of material is assigned the Active status. |
Status |
The status of the revision. The status can be any of the following:
|
Inventory ID | The identifier of the stock item that is produced by using the bill of material. |
Subitem |
The subitem of the stock item. This box is visible only if the Inventory
Subitems feature is enabled on the Enable/Disable Features
(CS100000) form.
Important: The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Warehouse | The warehouse to which the produced stock item is received when the item production is completed. |
Description | A description of the bill of material. The system copies the description to production orders that are created by using the bill of material. |
Start Date | The date when the BOM revision becomes effective. |
End Date |
The last date when the BOM revision is effective. After this date, users will not be able to create production orders based on the BOM. You can specify this date if the revision is effective during a limited period of time. When you click the Archive BOM command, the system sets this date to the current business date. |
Left Pane
In the left pane, you can view the bill of material structure in the tree. You can also modify the BOM by dragging the tree nodes to the needed locations if the BOM is on hold.
Element | Description |
---|---|
Filter | In this box, you enter keywords and the system displays only the tree nodes that contain the keywords in the ID or description. |
Element | Description |
---|---|
BOM tree |
Displays the operations and materials. If a material is a subassembly, all the nested operations and materials are also displayed. For the list of icons that represent the tree nodes, see Icons in the BOM Tree. |
Qty | The quantity of the material required for an operation. |
UOM | The unit of measure for the material quantity. |
Commands |
The More button, which you can click to view the commands that are appropriate for the selected node. For the list of possible commands, see the following table. This column is displayed on the pane only if the selected bill of material has the On Hold status. |
Command | Description |
---|---|
If the tree node is a bill of material, the following command is available on the More menu. | |
Add child | Adds a new operation. |
If the tree node is an operation, the following commands are available on the More menu. | |
Add sibling | Adds a new operation on the same level as the current operation. |
Add child | Adds a new material beneath the operation. |
Delete | Deletes the operation. |
If the tree node is a material, the following commands are available on the More menu. | |
Add sibling | Adds a new material on the same level as the current material. |
Delete | Deletes the material. |
Icon | Description |
---|---|
The top-level bill of material. | |
An operation that is performed internally. | |
An outside operation. | |
A material that is a subassembly. This material has an assigned bill of material. | |
A material that is a phantom subassembly. | |
A material of an outside operation that is a subassembly. | |
A material that is a finished stock item. | |
A material that is a phantom stock item without a BOM assigned. | |
A material of an outside operation that is a finished stock item. | |
A material that is a non-stock item. | |
A material that is a phantom non-stock item without a BOM assigned. | |
A material of an outside operation that is a non-stock item. |
Right Pane for an Operation Node
On the right pane, you can view the settings of the selected tree node. You can also make changes to these settings if the status of the selected bill of material is On Hold. The information on the pane differs depending on the type of node that is selected in the tree; when the top-level node is selected (the bill of material itself), no information is displayed on the pane.
This section describes the contents of the right pane if an operation node is selected in the BOM tree.
Element | Description |
---|---|
Operation ID | The numeric identifier of the operation, which determines the sequence in which operations are executed in production orders. |
Work Center | The work center where the operation takes place. |
Operation Description | The description of the operation. The system copies the value to this box from the work center description on the Work Centers (AM207000) form. |
Element | Description |
---|---|
Operation ID |
The numeric identifier of the operation, which determines the sequence in which the operation is executed in production orders. We recommend that you use a consistent numbering scheme that gives you the ability to insert operations, such as 10, 20, and 30 rather than 1, 2, and 3. For details, see Bills of Material: Operations. You can change this identifier, and if necessary, the system will change the sequence of operations. Any changes in the sequence will be reflected in new production orders based on this bill of material but not existing ones. Attention:
When a user creates a production
order, the system generates operation identifiers, which may differ from those in the
bill of material on which the order is based. During the generation of operation IDs for
the production order, the system maintains the order of operations specified in the bill
of material. In the production order, the system assigns 0010 as the identifier
of the first operation and then increases the identifier of each new operation by 10.
Thus, the second operation ID will be 0020 and the third operation ID will be
0030. |
Work Center | The active work center where the operation takes place. The work center determines the standard labor costs for the cost rollups. |
Oper Desc | The description of the operation. The system copies the value to this box from the work center description on the Work Centers (AM207000) form. |
Setup Time |
The time it takes to prepare to start the operation. Based on this time, the system adds a fixed labor cost to the cost of the produced item regardless of the size of the order. The system always backflushes the setup time for the first labor or move transaction to record the quantity completed. |
Run Units |
The number of units produced during the specified run time for the operation. |
Run Time |
The time required to produce the specified run units of the operation. If the number of run units is zero, then the system does not consider the run time in the production cost. |
Machine Units |
The number of units produced during the specified machine time for the operation. You specify the value of this box if machines are involved in the operation. |
Machine Time |
The time required to produce the number of machine units specified for the operation. If the number of machine units is zero, then the system does not consider the machine time in the production cost. You specify the value of this box if machines are involved in the operation. |
Queue Time |
The time a semi-finished item has to wait in the work center before workers can start processing the item. |
Finish Time |
The time required for the semi-finished item to be prepared for the next operation when the current operation has been finished. |
Move Time |
The time for a semi-finished item to be moved from the work center where the current operation is performed to the work center where the next operation will be performed. |
Backflush Labor |
A check box that indicates (if selected) that the system backflushes the cost of the labor hours spent for the operation. Attention:
The system does not apply this setting to machine time, which
is always backflushed. The system copies the default state of the check box from the Backflush Labor check box on the Work Centers (AM207000) form. |
Scrap Action | The default scrap action for the operation in new production orders. You can
select one of the following options:
The system copies the default value of this box from the Scrap Action Default box on the Work Centers (AM207000) form. |
Control Point |
A check box that indicates (if selected) that the operation is a control point. If it is, for this operation, workers must record the quantity of completed items. |
Element | Description |
---|---|
Reference Designators | Opens the Reference Designators dialog box. |
Reset Lines | Resets the values in the Line Order column to the
original order of lines. Note: This column is hidden by default. You can display
this column in the table by using the Column Configuration dialog box. For
details, see Table Layout: Process Activity. |
The table contains the following columns. | |
Inventory ID | The identifier of the item used as a material. |
Subitem |
The subitem of the inventory item. This box is visible only if the Inventory
Subitems feature is enabled on the Enable/Disable Features
(CS100000) form.
Important: The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Description | The description of the inventory item. |
Qty Required |
The material quantity needed to produce the item. The system calculates the final quantity based on the combination of this value and the value of the Batch Size column. A negative quantity indicates that the row represents a by-product. |
Batch Size |
The additional parameter that you can use to flexibly set up the required material quantity. The system uses this value to calculate the final quantity of the material. You specify the value of the box as follows:
For more information, see Bills of Material: Operations. |
UOM |
The unit of measure for the quantity specified in the Qty Required column. The system copies the default value from the Stock Items (IN202500) form. You can specify a different unit of measure, if needed. |
Unit Cost |
The unit cost for the material. The system copies the default value from the Price/Cost tab of the Stock Items (IN202500) form depending on the valuation method of the item as follows:
You can change the unit cost, if needed. If the unit cost was not changed manually, the system updates this value during the cost roll process on the Cost Roll (AM508000) form. |
Planned Cost | The planned cost of the inventory item. The system calculates the planned cost
when a user creates a production order based on the BOM and then recalculates the
cost when the user releases the production order. Attention: This column
has been added for informational purposes only. |
Material Type |
The type of the material. You can select one of the following options:
|
Subcontract Source |
The source of the material. The column is available only when Subcontract is selected in the Material Type box. You can select one of the following options:
|
Phantom Routing |
The way of adding operations of the material that is a phantom subassembly to production orders based on the BOM. You can select one of the following options:
|
Backflush |
A check box that indicates (if selected) that the material is backflushed. If the check box is cleared, you must issue materials for the operation on the Materials (AM300000) form before workers can record labor time or produced item quantities. The system copies the default state of this check box from the Backflush Materials check box on the Work Centers (AM207000) form. |
Warehouse | The warehouse from which the material is issued. If this box is empty, the system uses the warehouse specified in the Warehouse box of a production order on the Production Order Maintenance (AM201500) form. |
Location |
The warehouse location from which the material is issued. If the column is empty, the system selects a warehouse location, as described in Production Processing: Selection of Warehouse Locations. If the Backflush check box is selected and the warehouse location is specified, the material is issued only from this location as follows:
|
Comp BOM ID |
The bill of material that is used to produce the material that is a subassembly. You can specify the BOM in this column if a bill of material that differs from the default one should be used to produce the material for the BOM selected in the Summary area. If the column is empty, the system uses the BOM specified in the Default BOM ID box either on the Stock Items (IN202500) or Item Warehouse Details (IN204500) form. |
Comp BOM Revision | The revision of the BOM that is specified in the Comp BOM ID. This box is required if the BOM is specified. |
Scrap Factor |
The scrap or shrinkage factor for the material. The system uses this value to calculate the needed material quantity and the material cost for the item being produced in a production order and during material requirements planning. You enter the scrap percentage as a decimal value, such as 0.1 for 10% of scrap per item unit. You specify this value if the material scrap is common and the system must consider it during the calculation of the material quantity and cost. |
Bubble Number | The number of the material on the engineering drawing that relates to the BOM. |
Effective Date | The date when the system starts using the material for the item production. This date is independent of the start and end dates of the BOM. |
Expiration Date | The date when the system stops using the material for the item production. This date is independent of the start and end dates of the BOM. |
Line Order |
The number that indicates the order of the material in the list. Note:
This column is hidden by default. You can display
this column in the table by using the Column Configuration dialog box. For
details, see Table Layout: Process Activity. |
Element | Description |
---|---|
Ref Des | The identifier of the reference designator to be added. |
Description | The description of the new reference designator. |
The dialog box contains the following buttons. | |
OK | Saves your changes and closes the dialog box. |
Cancel | Closes the dialog box without saving your changes. |
Element | Description |
---|---|
Description | The description of the step in the work instruction. |
Line Order | The order number of the step that is defined by the sequence of steps in the operation. |
Element | Description |
---|---|
Tool ID | The identifier of the tool. |
Description | The read-only description of the tool, which the system copies from the Tools (AM205500) form. |
Qty Required | The quantity of the tool per item unit that is required for the operation. |
Unit Cost |
The unit cost of the tool. By default, the system copies this cost from the Tools (AM205500) form, but you can change the cost if needed. |
Element | Description |
---|---|
Overhead ID | The overhead identifier. |
Description | The read-only overhead description, which the system copies from the Overhead (AM202500) form. |
Type | The read-only overhead type, which the system copies from the Overhead (AM202500) form. |
Factor | The multiplier that the system uses to calculate the overhead cost for the operation. The system applies the multiplier to the cost rate specified on the Overhead (AM202500) form. |
Element | Description |
---|---|
Outside Process |
A check box that indicates (if selected) that the operation takes place at another organization; that is, the process is outsourced. By default, the system copies the check box state from the settings of the assigned work center on the Work Centers (AM207000) form. |
Drop Shipped to Vendor | A check box that indicates (if selected) that the item being produced is shipped directly to the subcontractor from the previous storage place. |
Vendor | The subcontactor that processes items for the operation. |
Location |
The subcontractor's location to which the items to be produced are delivered and from which the ready items are received. This box is displayed only when the Business Account Locations feature is enabled on the Enable/Disable Features (CS100000) form. |
Right Pane for a Material Node
On the right pane, you can view the settings of the selected tree node. You can also make changes to these settings if the status of the selected bill of material is On Hold. The information on the pane differs depending on the type of node that is selected in the tree.
This section describes the contents of the right pane if a material node is selected in the BOM tree.
Element | Description |
---|---|
BOM ID | The identifier of the bill of material. |
Revision | The identifier of the BOM revision, which is the modification of the bill of material. |
Hold |
A check box that you select to change the bill of material's status to On Hold so that you can make changes to it. |
Status |
The status of the revision. The status can be any of the following:
|
Inventory ID | The identifier of the stock item that is produced by using the bill of material. |
Subitem |
The subitem of the stock item. This box is visible only if the Inventory
Subitems feature is enabled on the Enable/Disable Features
(CS100000) form.
Important: The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Warehouse | The warehouse to which the produced stock item is received when the item production is completed. |
Description |
The description of the bill of material. The system copies the description to production orders that are created by using the bill of material. If the Hold check box is selected, this box is available for editing. |
Start Date |
The date when the BOM revision becomes effective. If the Hold check box is selected, this box is available for editing. |
End Date |
The last date when the BOM revision is effective. After this date, users will not be able to create production orders based on the BOM. You can specify this date if the revision is effective during a limited period of time. When you click the Archive BOM command, the system sets this date to the current business date. If the Hold check box is selected, this box is available for editing. |
Element | Description |
---|---|
Operation ID | The numeric identifier of the operation, which determines the sequence in which operations are executed in production orders. |
Work Center | The work center where the operation takes place. |
Operation Description | The description of the operation. The system copies the value to this box from the work center description on the Work Centers (AM207000) form. |
Element | Description |
---|---|
Inventory ID | The identifier of the item used as a material. |
Subitem |
The subitem of the inventory item. This box is visible only if the Inventory
Subitems feature is enabled on the Enable/Disable Features
(CS100000) form.
Important: The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Description | The description of the inventory item. |
Qty Required |
The material quantity needed to produce the item. The system calculates the final quantity based on the combination of this value and the value of the Batch Sizecolumn. A negative quantity indicates that the row represents a by-product. |
UOM |
The unit of measure for the quantity specified in the Qty Required column. The system copies the default value from the Stock Items (IN202500) form. You can specify a different unit of measure, if needed. |
Backflush |
A check box that indicates (if selected) that the material is backflushed. If the check box is cleared, you must issue materials for the operation before workers can record labor time or produced item quantities. The system copies the default state of this check box from the Backflush Materials check box on the Work Centers (AM207000) form. |
Scrap Factor |
The scrap or shrinkage factor for the material. The system uses this value to calculate the needed material quantity and the material cost for the item being produced during the item production and material requirements planning. You enter the scrap percentage as a decimal value, such as 0.1 for 10% of scrap per item unit. You specify this value if the material scrap is common and the system must consider it during the calculation of the material quantity and cost. |
Unit Cost |
The unit cost for the material. The system copies the default value from the Price/Cost tab of the Stock Items (IN202500) form depending on the valuation method of the item as follows:
You can change the unit cost when you add a new material, if needed. The system updates this value during the cost roll process on the Cost Roll (AM508000) form. |
Planned Cost | The planned cost of the inventory item. The system calculates the planned cost
when a user creates a production order based on the BOM and then recalculates the
cost when the user releases the production order. Attention: This box has
been added for informational purposes only. |
Material Type |
The type of the material. You can select one of the following options:
|
Subcontract Source |
The source of the material. The box is available only when Subcontract is selected in the Material Type box. If the material type is Subcontract, you can select one of the following options:
|
Phantom Routing |
The way of adding operations of a phantom subassembly to production orders based on the BOM. You can select one of the following options:
|
Warehouse | The warehouse from which the material is issued. If this box is empty, the system uses the warehouse specified in the Warehouse box of a production order on the Production Order Maintenance (AM201500) form. |
Location |
The warehouse location from which the material is issued. If the box is empty, the system selects a warehouse location, as described in Production Processing: Selection of Warehouse Locations. If the Backflush check box is selected and the warehouse location is specified, the material is issued only from this location as follows:
|
Comp BOM ID |
The bill of material that is used to produce the material that is a subassembly. You can specify the BOM in this box if a bill of material that differs from the default one should be used to produce the material within the BOM selected in the Summary area. If the box is empty, the system uses the BOM specified in the Default BOM ID box either on the Stock Items (IN202500) or Item Warehouse Details (IN204500) form. |
Comp BOM Revision | The revision of the BOM specified in the Comp BOM ID. This box is required if the BOM is specified. |
Bubble Number | The number of the material on the engineering drawing that relates to the BOM. |
Effective Date | The date when the system starts using the material for the item production. This date is independent of the start and end dates specified in the Summary area. |
Expiration Date | The date when the system stops using the material for the item production. This date is independent of the start and end dates specified in the Summary area. |
Element | Description |
---|---|
BOM ID | The identifier of the bill of material. |
Revision | The identifier of the BOM revision, which is a modification of a bill of material. |
Hold |
A check box that indicates (if selected) that you can make changes to the BOM. |
Status | The status of the revision. The status can be any of the following:
|
Description | The description of the bill of material. The system copies the description to production orders created by using the bill of material. |
Inventory ID | The identifier of the stock item that is produced by using the bill of material. |
Subitem |
The subitem of the stock item. This box is visible only if the Inventory
Subitems feature is enabled on the Enable/Disable Features
(CS100000) form.
Important: The Inventory
Subitems check box has been removed from the Enable/Disable Features (CS100000) form because the functionality
associated with the Inventory Subitems feature will be phased out. If you have
this feature enabled in your system, the associated functionality remains available. To
disable the feature, contact your MYOB support provider. |
Warehouse | The warehouse to which the produced stock item is received when item production is completed. This box is required because bills of material are warehouse-specific. |
Start Date | The date starting from which the BOM revision becomes effective. |
End Date | The last date when the BOM revision is effective. After this date, users will not be able to create production orders based on the BOM. |