To Link a Bill Line to Landed Cost Document
To link a particular line of an existing Accounts Payable bill to a line of landed cost document, you use the Bills and Adjustments (AP301000) form.
To Link an Accounts Payable Bill to Landed Cost Document
- Open the Bills and Adjustments (AP301000) form.
- In the Type box, select Bill, and select the needed bill by its reference number.
- On the table toolbar of the Document Details tab, click a line with an empty inventory ID to which a landed cost should be linked, and click Link Line on the table toolbar. In the Link Line dialog box, which opens with the Landed Cost mode selected, select the unlabeled check box next to the landed cost line to be linked.
- Click Add & Close to close the dialog box and link the selected line.
- Optional: Correct the Ext. Cost of the bill line, if needed.
- Click Save to save your changes.
Notes About the Procedure
The notes in this section describe the nuances of the UI elements available on the form, such as when an element is required and when it is not, and when the system fills in settings by default. This section can include other notes.
Note the following about adding landed costs to a bill:
- You can link a landed costs line to a line with empty Inventory ID only. Once you have linked a landed cost line, the description of a bill line changes to the description of the linked landed cost.
- Each bill line can be linked to only one landed cost line.
- The Link Line dialog box shows the lines of released landed cost documents for which the Accounts Payable bill wasn't created on release.
- If the amount in the bill line differs from the amount in the landed cost line that you linked, the occurred difference is posted to the Landed Cost Variance account. For details, see Adjusting the Landed Cost Variance.