Production Processing: Implementation Checklist

The following sections provide details you can use to ensure that the system is configured properly for production processing, and to understand (and change, if needed) the settings that affect the processing workflow.

Prerequisites

Make sure that the following tasks have been performed before you start implementing production processing:

Implementation Checklist

We recommend that before you initially start processing production orders, you make sure the needed features have been enabled, settings have been specified, and entities have been created, as summarized in the following checklist.

Form Criteria to Check
Enable/Disable Features (CS100000) The following features have been enabled:
  • The Manufacturing group of features. If you use additional manufacturing functionality (such as estimates), make sure that the corresponding features have been enabled within this group of features.
  • The Inventory feature within the Inventory and Order Management group of features.
Production Order Types (AM201100) Production order types have been created, as described in Production Order Types: General Information.
Production Preferences (AM102000) All necessary settings related to production management have been specified.

Other Settings That Affect the Workflow

You can affect the workflow of processing production orders by specifying additional settings on the Production Preferences (AM102000) form as follows:

  • To cause labor, move, material, and WIP adjustment transactions to be created with the On Hold status (so that the user can verify them before processing them further), on the Production Preferences (AM102000) form, you select the Hold Documents on Entry check box.
  • To make the system validate totals on labor, move, material, and WIP adjustment transactions, on the Production Preferences form, you select the Validate Document Totals on Entry check box.
  • To make the system immediately update the available quantities of items, on the Inventory Preferences (IN101000) form, you select the Automatically Post on Release check box.

Validation of Configuration

To make sure that all configuration has been performed correctly, we recommend that in your system, you perform instructions similar to those described in Production Processing: To Process Production-Related Documents and Transactions.