Drawing Logs: Implementation Checklist

The following sections provide details you can use to ensure that the system is configured properly for working with drawing logs, and to understand (and change, if needed) the settings that affect the processing workflow.

Implementation Checklist

Before you begin working with drawing logs, you should make sure the needed features have been enabled, settings have been specified, and entities have been created, as summarized in the following checklist.

Form Criteria to Check
Enable/Disable Features (CS100000) form Make sure that the Projects, Construction, and Construction Project Management features are enabled.
Drawing Log Preferences (PJ102000) form Make sure that the necessary settings related to drawing logs have been specified.
Projects (PM301000) form Make sure that the necessary project has been created.