Drawing Logs: Implementation Checklist
The following sections provide details you can use to ensure that the system is configured properly for working with drawing logs, and to understand (and change, if needed) the settings that affect the processing workflow.
Implementation Checklist
Before you begin working with drawing logs, you should make sure the needed features have been enabled, settings have been specified, and entities have been created, as summarized in the following checklist.
Form | Criteria to Check |
---|---|
Enable/Disable Features (CS100000) form | Make sure that the Projects, Construction, and Construction Project Management features are enabled. |
Drawing Log Preferences (PJ102000) form | Make sure that the necessary settings related to drawing logs have been specified. |
Projects (PM301000) form | Make sure that the necessary project has been created. |