Project Billing Preparation: Mass Processing
This topic explains how to perform mass-processing operations related to project billing, and how the system generates, changes, or works with documents as a result of the mass processing.
Mass-Billing Projects
Multiple projects can be billed at the same time on the Run Project Billing (PM503000) form. On this form, you can run billing for multiple projects that are pending billing as of the Invoice Date, which is selected in the Summary area of the form. You can also narrow the projects to be shown by specifying the statement cycle, customer class, customer, and project template in the Selection area of the form. For more information on preparing projects for billing, see Project Billing Preparation: General Information.
In the table on the form, the system lists the following projects:
- For progress billing, projects that have a nonzero Pending Invoice Amount Total (which can be either positive or negative). For more information about the progress billing process, see Progress Billing: General Information.
- For time and material billing, projects that have unbilled project
transactions—that is, the transactions with the Billed check
box cleared on the Project Transactions (PM304000) form. The system selects
these project transactions based on the option selected in the Billing Cut-off
Date box on the Projects Preferences (PM101000) form as
follows:
- If Include Trans. created on billing date is selected, the system selects all unbilled transactions with dates earlier than or the same as the Invoice Date selected in the Summary area of the form.
- If Exclude Trans. created on billing date is selected, the system selects all unbilled transactions with dates that are earlier than the Invoice Date.
For more information about the time and material billing process, see Time and Material Billing: General Information.
- For recurring billing, projects that include at least one non-completed project task
that has been configured for recurring billing. The system shows the projects billed on
demand and the projects that have a Next Billing Date, which is
specified on the Summary tab of the Projects
(PM301000) form, that is earlier than or the same as the billing date. (The billing date
is specified in the Invoice Date box in the Selection area of the
Run Project Billing form.)
For more information about recurring billing, see Project Billing Preparation: Recurring Billing.
When you run billing, the system creates pro forma invoices or accounts receivable invoices (depending on the workflow configured for the project) with the billing date, which is specified in the Invoice Date box.