MRP Review


Use the MRP Review form to manage the suggested plan created by the MRP generation process. You can filter order types and planned order or action messages to display a reduced set of recommendations for review and management. Inventory trees can also be used as a review filter.

Options Reference

Each option and field on the form is described below. Mandatory options and fields are highlighted in red.

MRP File name

Select the name of an MRP file from the dropdown list.

Demand time fence

If this is for the selected MRP file, it displays on the form as read only.

Selection Criteria

Use this section of the form to filter the generated plan for viewing in the table. You can also select whether to view action messages and/or planned orders. Then, click the Apply button.

Table Details

Detail displays in the table using the colours assigned on the MRP User Preferences form.

Type

This column displays the type of order of the line:

  • Planned PO - A system-generated recommendation to create a purchase order.
  • Planned FO - A system-generated recommendation to create a factory order.
  • PO - An existing purchase order.
  • FO - An existing factory order.

Message

This column displays the action message of the line:.

  • Cancel Scheduled Receipt - This scheduled receipt is not required.
  • De-expedite scheduled receipt - The scheduled receipt is not required until a later date.
  • Expedite scheduled receipt -The scheduled receipt is required before it is due for receipt.
  • Planned order is past due - The planned order is overdue.
  • Scheduled receipt is past due - The scheduled receipt is overdue.
  • Late for releasing planned order - The planned order should have been released by now to meet its due date.
  • Release - A planned order can be released.

Release Date

For a planned order type, this is the date the order should be released to meet the due date. For a PO or FO type, this is the date the order was actually released on.

Due Date

If the planned order is generated from a forecast, the due date is the start date of the forecast period it is required for. If the planned order is based on a dependent demand, the due date is the release date of the requirement that generated it.

Note: Combine more than one planned order into a single purchase order for the same item code by updating the due dates on the lines to the same date.

Res Due Date

This field displays the rescheduled date, required to meet the forecast or sales plan.

Item Code

This column displays the inventory item code the line relates to.

Description

This column displays the inventory item description the line relates to.

Quantity

This column displays the recommended quantity of the planned order that Greentree Desktop calculated, or the quantity remaining of a scheduled receipt.

Reference

This field displays the purchase or factory order number.

Supplier Code

This field displays the supplier for a purchased inventory item.

You can select a supplier if Greentree Desktop doesn't find one. The code defaults to all subsequent lines in the table for the same item code with a empty supplier.

Supplier Name

This field displays the name of the selected supplier.

Location

This field displays the location of the order.

Select

Click this checkbox to include in the Perform Actions or Create orders process.

Firm

Select this option to indicate that the planned order is a firm planned order. The order is treated as a scheduled receipt when re-calculating and is not be deleted.

Note: Double-click on a planned order in the table to display data that was used to generate the requirement. Information displays on the MRP Planned Order Source Information form.

Right click MRP Date Requirement Information. This field displays the same information as the MRP Planned Order Source Information, but relates specifically to data used as input to the calculation of the requirement date.

Apply Criteria

Click this button to apply the selection criteria and return details to the table.

Planning Board

Click this button to open the Planning Board Filter Form.

Perform actions

Click this button to perform the actions for messages for selected lines in the table.

Create

Click this button to create purchase or factory orders for selected lines in the table. When orders are successfully created, the Orders Created from MRP form displays. As you create new orders, they are added to the list, which you can view by clicking the View Orders button. The form displays purchase orders and factory orders on separate tabs.

Note: f the Bill of Materials Maintenance option to Create MRP order per batch size is selected for the bill of material of the order, multiple orders is generated using the batch size, if the total requirement exceeds the batch size.

For example, if the batch size is 10 and a total (cumulative) requirement of 50 is calculated using the generation process, five individual orders for a quantity of 10 is created.

Additional Requirements

The requirements for the additional material may already have been calculated and the additional quantity will not have been included in any calculations. The additional material has a low level code:

  • Less than the parent item of the factory order it was added to. The material requirements for the additional material have already been calculated.
  • Equal to the parent item of the factory order, but is alphabetically before the parent item code. The material requirements for the additional material have already been calculated.

Example

Item A low level code = 0. Item B low level code = 0. If a factory order for Item B has Item A as an additional item, this requirement is not included in Item A's calculation as Item A's requirements have already been calculated.

When these circumstances occur, the Additional Requirements button is enabled. You must review the additional requirement and raise a purchase or factory order.

View Orders

Click this button to view orders created for the selected MRP file name.

Unselect All

Click this button to deselect all visible lines in the table.

Select All