Budget Tree: [1]JaniceI am curious. This is a Configuration Prerequisites topic and for all the other chunks, Implementation Checklist topics are used instead. Isn't this process similar enough to Preparing a Simple Budget and Preparing a Hierarchical Budget that they all should use the same type of topic.2019/12/1622:03:55-05:00Configuration Prerequisites

Before you start to configure a budget tree, you must be sure that the system has been configured properly and that all required entities have been created, as described in the following sections.

Enabling the Needed Features

On the Enable/Disable Features (CS100000) form, the minimum set of features has to be enabled.

Also, if subaccounts are used in your system, make sure the Subaccounts feature has been enabled.

Configuring the System

You need to make sure that the following implementation tasks have been performed in MYOB Acumatica before you begin configuring a budget tree:

If subaccounts are used in your system, make sure that the following implementation has been performed: